Page 54
6.3. BOOST GAGE INSTALLATION
Attention: We suggest starting routing of boost gage line from interior to outside. Apply the
Teflon tape (or thread seal) on to all pipe thread connections.
Parts:
Boost Gage (4301)
Coupling (P/N 203200)
Pipe fitting (P/N 213210)
Tee fitting (P/N 227200)
a) Remove the auxiliary gauge cluster;
b) Remove one on the OEM gages in the auxiliary gauge cluster (whichever
you consider less important than the other). We recommend removing the
voltmeter gage;
c) Cut the black wire and the red/yellow wire that were connected to the
voltmeter gage (if this is the gage that you removed) and isolate them with
electrical tape or shrink tubing;
We recommend installing
the Boost Gage here
Comments to this Manuals